Ahmedabad Metro Map

⬇️ Download
📥 Downloads: 0 ⚠️ Reports: 0

Ahmedabad Metro Map, અમદાવાદ મેટ્રો નકશો, Status Update, Route Map, Fares & Tenders, Ticket Price, Route Time Table, Station List PDF Free Download

Ahmedabad Metro Map PDF Download

Gujarat Metro Rail Corporation (Gmrc) Limited, Formerly Known As “Metro-link Express For Gandhinagar And Ahmedabad” (Mega), Is Building The Ahmedabad Metro, An Urban Mass Rapid Transit System (Mrts), To Serve Gandhinagar, Gujarat’s Capital, And Ahmedabad, The State’s Largest City, In The Future.

Phase 1 Of The Ahmedabad Metro, Which Comprises Routes Totaling 39.259 Kilometres, Began Construction In 2015. In March 2019, A 6 Kilometre Stretch Of Line-1 Between Apparel Park And Vastral Gam Was Opened. On September 30, 2022, The Remainder Of Phase 1-aside From The 1.4 Kilometre Thaltej – Thaltej Gam Section-was Officially Opened.

The Delhi Metro Rail Corporation (Dmrc) Was Chosen By The Gujarat State Government In February 2016 To Create The Detailed Project Report For Phase 2. The State Budget For Gujarat For 2016–17 Included A Budgetary Allocation Of Rs 2 Crore (Dpr). According To The Draught Dpr, The 18.522 Km Line-2 Would Be Extended Northward To Link With Gandhinagar’s Mahatma Mandir And Will Include One Branch/spur Line To Gift City. For More Details, See Here.

The Construction Of A 28.254 Km Phase 2 With 2 Corridors, A Northward Expansion Of Line-2 With A Brief Offshoot, Was Authorised By India’s Union Cabinet In February 2019. The Prime Minister Formally Placed Its Cornerstone On March 4, 2019.

System Specifications

  • Top Speed : 80 kmph
  • Average Speed : 33 kmph
  • Track Gauge : Standard Gauge – 1435 mm
  • Electrification : 750 V DC Third Rail
  • Signalling : Communication-based Train Control (CBTC)

Key Figures

Operational: 37.86 km (Phase 1) | Under Construction: 21.42km (Phase 1, Phase 2) | Approved: 7.41 km (Phase 2)

  • Daily Ridership: 35,000/day (February 2020)
  • Rolling Stock: 96 coaches (32 train-sets x 3) supplied by Hyundai Rotem

Operational Lines (Phase 1)

  • Line-1  Blue Line: Vastral Gam – Thaltej (19.38 km, 16 stations)
  • Line-2  – Red Line: Motera – APMC (18.522 km, 16 stations)

Under Construction Lines (Phase 1, Phase 2)

  • Line-1  Blue Line: Thaltej – Thaltej Gam (1.4 km, 1 station)
  • Line-2  – Red Line: Motera – GNLU – Gandhinagar Sector 1 (14.60 km, 13 stations)
  • Line-3 (Eastern Spur of Line-2): Gujarat National Law University (GNLU) – GIFT City (5.416 km, 2 stations)

Note: Blue Line is also known as East-West Line. Red Line is also known as North – South Line.

Approved Lines (Phase 2)

  • Line-2  Red Line: Gandhinagar Sector 1 to Mahatma Mandir (7.41 km, 7 stations)
    Note – Dilip Buildcon was declared lowest bidder in September 2022